company

20151217_105207.jpg

Qatar Update: Drawdown Acheived For New ‘Al Dafnah District’ Project

WJ Groundwater is currently working with Dutch Foundation to dewater a 2B+G+1+30 residential building in Doha, Qatar.  The property is located in the Al Dafnah District, also known as the Diplomatic Area. The project consultant is LACASA (Qatar).

20151217_105207

The WJ Groundwater team led by Noel Melendez (Project Manager) and Vijayakumar (Site Engineer) is deploying a number of deepwells that are supplemented by a level of trenching and sumping to control groundwater levels.

read more
WJ GroundwaterQatar Update: Drawdown Acheived For New ‘Al Dafnah District’ Project
AqvtgML1FUXF5oaJUPXdFwlN-7mBUJXC1E0LJ5hbvU25.jpg

An Arabian Celebration

With WJ Groundwater’s Year End Parties there’s always cause to celebrate and 2015’s event was no different.

On a mild, Tuesday night WJ Groundwater team members and guests from all over the west coast of the Arabian Peninsula and beyond got together at the prestigious Oryx Rotana Hotel in central Doha.

read more
WJ GroundwaterAn Arabian Celebration
12191596_1638650583074652_6232364625934201140_n.jpg

Dr Toby Roberts To Speak At Arabian Tunnelling Conference

WJ Groundwater‘s chairman Dr Toby Roberts has been invited to speak at this year’s Arabian Tunnelling Conference and Exhibition 2015 (ATC).

The event is to take place at The Grand Hyatt, Dubai, UAE on 23-25 November and the ‘theme’ this year is ‘Innovative Underground Infrastructure – Challenges and Opportunities’. 

read more
WJ GroundwaterDr Toby Roberts To Speak At Arabian Tunnelling Conference
Dubai-Canal-Sept-150002.jpg

WJ Purchases Booster Station for Dubai Canal Extension Project.

Equipment Quickie:

WJ Groundwater (Middle East) has purchased a booster station The technology has been put to work on the Dubai Canal Extension Project. It can pump up to 600 l/s and it is currently feeding off approximately 100 No. deepwells along the course of the Canal. It thrusts the water down a 630mm diameter discharge line 2km to the sea. The station box includes automated monitoring and in-line flow meters on each pump.

Dubai Canal Sept 150002

Dubai Canal Sept 150001

Photos by Ollie Vincent

read more
WJ GroundwaterWJ Purchases Booster Station for Dubai Canal Extension Project.