Contact us
qatar@wj-me.com
WJ Qatar
  •  Services
    •  Services
      • Dewatering
      • Overpumping and Bypass
      • Drilling
      • Pumping Test, In-house Design and Consultancy
      • Groundwater Treatment & Remediation
      • Geotechnical & Environmental Monitoring
    •  Sectors
      • Airports
      • Basements
      • Infrastructure
      • Ports, Canals and Marine
      • Power Stations & Desalination Plants
      • Sewage Treatment Works
      • Shafts, Tunnels and Pipelines
      • Underground Rail & Metro
  • Rental
  • Projects
  •  About Us
    • Gallery
    • Careers
  • Downloads
  • News
  • Contact

Al Maktoum Hospital Phase 2

On the historical site of the Al Maktoum Hospital, this re-development included construction of three neighbouring buildings and a great solution from WJ Groundwater.

The basements of the three buildings were constructed within one large irregular shaped excavation with a perimeter of approximately 1,200m. The excavation was up to 9m and was supported by secant piles around the perimeter.

WJ worked closely with the piling specialist Stromek Emirates Foundation LLC to come up with a dewatering solution that meant that the deepwells could be located in the indent of the secant piles. This meant that the deepwells were kept outside of the footprint of the proposed basements, removing the requirement for complicated structural and waterproofing details. This also made protecting and maintaining the dewatering system simple as they could be accessed from the top of the capping beam.

The project was a great success and this was another example of how good dewatering design and thoughtful implementation can maximise programme and commercial savings.

  • LOCATION: Dubai, United Arab Emirates
  • CLIENT: Al Maktoum Hospital Phase 2
  • MAIN CONTRACTOR: Stromek Emirates Foundation LLC

Project Scope

  • Basement
  • Building
  • Deepwell Dewatering
  • Excavations
Share

Related Projects

Big Data Institute, Oxford

Big Data Institute, Oxford

  • Deepwell Dewatering
  • -Read More-
  • Finch West LRT Project, Toronto

    Finch West LRT Project, Toronto

    New Tottenham Hotspur Stadium

    New Tottenham Hotspur Stadium

    White Hart Lane, in North London, was the home of Tottenham Hotspur FC for 118 years and during that time played host to some of the worlds greatest footballers before it was decided in 2017 that a new 62,000 seater state-of-the-art stadium, the biggest club stadium in London, would be built to replace the existing

    Interested? Find out more

    If you'd like to find out more about WJ Qatar, our services or recent projects, please get in touch


      Name (required)

      Your Email (required)

      Your Message

      t +974 4418 6349 | qatar@wj-me.com
      © 2021 WJ Groundwater Limited | Privacy Policy | Terms & Conditions
      Developed by Riotspace Creative Limited